Newtown Artesian Water PFAS Upgrades
Worth & Company partnered with GFT Engineer to address a critical environmental and public health challenge for the community.

The Newtown Artesian Water Company was a comprehensive water treatment system upgrade project designed to remove PFAS from the local water supply. Worth & Company executed a majority of the project scope, including sitework, concrete construction, erection of a new structural steel treatment building, and installation of all process equipment. One of the primary challenges Worth & Company encountered was the delivery and setting of the Granular Activated Carbon (GAC) systems. In order to accelerate the schedule, Worth erected the building shell in advance leaving out select steel membranes to allow the tanks to be installed and not slow the building process down. The units required three separate picks to maneuver them into their final position and proper orientation within the confined structure.
Related Approaches
- Value Engineering
- Virtual Design & Construction (VDC)
Related Attribute
- Fabrication
New Business Inquiries
Please reach out to discuss your project, and learn about our Industrial Construction capabilities.