Worth & Company was tasked with a Water Treatment Facility project that entailed replacing system components throughout the pipe gallery.

Worth & Company was tasked with a Water Treatment Facility project that entailed replacing media in four open top water filters and two open top clarifiers, replacement of influent plant valves, ductile iron pipe and fittings, chemical injection valves and piping replacement, specialty coatings, window replacement, and many actuated valves throughout the pipe gallery.
The original plan was to replace Filter #1 with a Stainless insert liner vs a specialty coating that was being applied in filters 2-4. The intent behind this was that the concrete was leaking so bad where the concrete couldn’t be repaired. However, Worth purposed repair products that could handle the toughest leak or repair as necessary. Worth did a structural inspection and found that the repairs that were needed were not major and the products we had specified would allow a coating to be applied. At the end of the project, the client was thrilled that they don’t have a band-aid on a filter anymore as they now have a permanent solution with a coating.
Related Approaches
- Value Engineering
- Virtual Design & Construction (VDC)
Related Attribute
- Fabrication
New Business Inquiries
Please reach out to discuss your project, and learn about our Industrial Construction capabilities.