Waste Management Fairless Landfill LFG Blower/Dehydration Station Expansion
The WM Fairless Landfill LFG Blower/Dehydration Station involved an expansion to the existing facility in Morrisville, PA.
In order to keep up with growing landfill gas production as a result of landfill expansion at Waste Management Fairless, an expansion to the existing Blower/Dehydration station (also constructed by Worth in 2017) was necessary. Working as the Mechanical Contractor, Worth installed all large-scale blower, dehydration, flare, and HVAC equipment along with associated piping and instrumentation systems. As the General Contractor, Worth oversaw civil, concrete, building erection, and electrical subcontractors. All stainless and HDPE piping necessary for the project was coordinated in-house through Worth’s VDC department and prefabricated at our shop facility.
Related Approaches
- Pre-Construction
- Virtual Design & Construction (VDC)
Related Attribute
- Fabrication
New Business Inquiries
Please reach out to discuss your project, and learn about our Industrial Construction capabilities.