F & S Fresh Foods Wastewater Treatment Plant
Worth & Company and Keystone Engineering partnered together on a high priority design build project that had to meet DEP requirements and stay within budget.

Worth & Company and Keystone Engineering joined forces to ensure the design not only was functional and met the needs of the client but also was designed in a way that allowed for the construction to be completed within the allotted budget and time constraints needed to be successful. This required true teamwork, collaboration and trust between client, engineer, and contractor. As a team we were able to build a Guaranteed Max Price Design Build Project that allowed these challenges to be managed and have a successful project completion.
Worth & Company took charge of procuring, installing, and commissioning a new industrial wastewater treatment plant. This facility includes an existing equalization tank, a new moving bed biofilm reactor, a new dissolved air flotation unit, chemical treatment systems, as well as pumps, blowers, and both above and below ground piping, valves, and other necessary accessories to ensure the treatment plant runs efficiently.
The comprehensive approach ensured that each part was meticulously integrated into the overall system, fostering seamless operations. Not only did this project meet stringent regulatory standards, but it also highlighted innovative engineering solutions aimed at sustainability and efficiency.
Related Approach
- Design-Build
Related Attribute
- Award Winner
New Business Inquiries
Please reach out to discuss your project, and learn about our Industrial Construction capabilities.