Freshpet Kitchens Wastewater Treatment Plant Upgrade
Worth & Company was awarded the Freshpet Wastewater Treatment Plant Upgrade Project during the 30% Design-Build phase under a GMP, Lump-Sum contract.

Worth & Company was awarded the Freshpet WWTP Upgrade Project during the 30% Design-Build phase under a Guaranteed Maximum Price, Lump-Sum contract. The primary goals for the upgrade consisted of increasing the influent treatment capacity from 400 GPM to 800 GPM, replacing the existing DAF system with larger roughing and polishing DAF units, enhancing advanced screening capabilities, upgrading the sludge processing and chemical treatment systems, and implementing electrical and SCADA improvements.
Worth’s construction workers and Freshpet plant operators conducted daily safety huddles to ensure safety remained at the forefront of all project activities. The design team played a critical role in supporting designs, layouts, electrical installations, and SCADA integration. The level of engagement from the entire project team ensured that every stakeholder remained aligned throughout the project.
Our team discovered an existing structural drawing that had not been documented in the original 2020 as-built records. The project team collaborated to come up with a solution to utilize micropiles and supplemental structural support systems. This prevented as much as a 12-month delay and significant unplanned costs to Freshpet.
Based on a tremendous effort by the whole project team, the construction finished on its original substantial completion date. Freshpet appreciated the overall work ethic from Worth & Company and acknowledged that the new treatment system was performing better than ever.
Related Approaches
- Design-Build
- Value Engineering
- Virtual Design & Construction (VDC)
Related Attributes
- Award Winner
- Fabrication
New Business Inquiries
Please reach out to discuss your project, and learn about our Industrial Construction capabilities.