Building Information 3D Modeling (BIM)

Saves Time & Dollars

In adherence with the company’s mission to be technologically advanced, Worth & Company is one of a few firms in the mechanical systems industry currently utilizing cutting-edge Building Information Modeling (BIM). This software enables our engineers to create a single, easily shared 3D product model, or “smart design,” of building components that include all the design information for a particular project. BIM, in conjunction with the pre-fabricated and pre-assembly process supports methodologies that maximize efficiency.


Location: Doylestown, PA
Size:

Owner: County of Bucks
Architect: HOK Architects
Engineer: HF Lenz


Bucks County Justice Center

Before

After

The benefits of utilizing BIM are numerous and vast:

  • BIM empowers collaboration.
  • BIM facilitates pre-fabrication and pre-assembly production which alleviates congestion at the jobsite.
  • BIM plays a key role in Lean Construction procedures.
  • BIM assists in the coordination of all HVAC, plumbing, and ductwork systems.
  • BIM provides a real space document that can be utilized by the construction team.
  • BIM reveals necessary design adjustments prior to the commencement of construction, avoiding delays and saving thousands of dollars.
  • BIM enables changes made to one element of the model to be implemented and reflected in all views.
  • BIM reduces fragmentation of the construction process, ensuring all parties are aligned.
  • BIM supports analysis for Sustainabel Building strategies.
  • The Worth & Company team is experienced and knowledgeable in applying the principles of BIM to many projects. By eliminating the unknown variables that come with building components onsite, the BIM process plays a key role in assuring a safe environment, consistent and quality workmanship, greater efficiency, and construction standardization.

    Contact Worth & Company for a tour of our processes and facilities: 1.800.220.1211


    Location: Dover, DE
    Project Manager: Jim Babin
    Piping Superintendent: Steve Sexton
    Sheet Metal Superintendent: Rob Petrucci


    Dover High School

    Before

    After


    Location: Dover, DE
    Project Manager: Jim Babin
    Piping Superintendent: Steve Sexton
    Sheet Metal Superintendent: Rob Petrucci


    Dover High School

    Before

    After


    Location: Wilmington, DE
    Project Manager: Sam Stefanik
    Superintendent: Jim Dougherty


    Ashland Chemicals

    Before

    After


    Location: Breinigsville, PA
    Project Manager: Trevor Teman
    Superintendent:Jeremy Heimbach


    Ocean Spray

    Before

    After